You can easily update a Project's Stage Dates within the Timeline tool: (1) Use the Drag & Drop functionality to adjust the length of the Stage; (2) Enter the Dates manually within the Start and End columns or (3) Update the Duration by entering a new value.

You can easily update a Project's Stage Dates within the Timeline tool: (1) Use the Drag & Drop functionality to adjust the length of the Stage; (2) Enter the Dates manually within the Start and End columns or (3) Update the Duration by entering a new value.